On Sat, Aug 24, 2019 at 11:48:10AM +0300, Dmitry Tunin wrote:
> http://rfs-rf.ru/upload/medialibrary/c1a/prilozhenie-1-k-resheniyu-gkrch-_-16_36_03.pdf
>
> Note that there was never a DFS requirement in Russia, but always was
> NO-OUTDOOR on 5GHz.
> Maximum power is 200mW that is ~23dBm on all 5GHz channels.
> Also Russia has never been regulated by ETSI.
>
> EIRP has been reduced by 4dBm because of TPC requirement.
>
> Signed-off-by: Dmitry Tunin <[email protected]>
Sorry for the delay. Applied, with some slight adjustments to the commit
message. Thanks!