Introduce short-duration task checks, as there is a
requirement to leverage this attribute for better task placement.

There are several choices of metrics that could be used to
indicate if a task is a short-duration task.

At first thought the (p->se.sum_exec_runtime / p->nvcsw)
could be used to measure the task duration. However, the
history long past was factored too heavily in such a formula.
Ideally, the old activity should decay and not affect
the current status too much.

PELT could decay the runtime time, so maybe something like
se.util_avg could be used. But after a second thought, PELT
might not be appropriate to measure the duration:
1. Task p1 and task p2 are doing frequent ping-pong scheduling on
one CPU, both p1 and p2 have a short duration, but the util_avg
can be up to 50%.
2. Suppose a task lasting less than 4ms is regarded as a short task.
If task p3 runs for 6ms and sleeps for 32ms, it should not be a
short-duration task. However, PELT would decay p3's accumulated
running time from 6ms to 3ms, because 32ms is the half-life in PELT.
As a result, p3 would be incorrectly treated as a short task.

It was found that there was once a similar feature to track the
duration of a task, which is in Commit ad4b78bbcbab ("sched: Add
new wakeup preemption mode: WAKEUP_RUNNING"). Unfortunately, it
was reverted because it was an experiment. So pick the patch up
again, by recording the average duration when a task voluntarily
switches out. The calculation of average duration is borrowed
from the idea of Exponential Weighted Moving Average (EWMA) in
util_est_update(). The effect is that the average task duration
is calculated by:
new_avg_duration = old_avg_duration * 0.875 + lastest_duration * 0.125;
which is what update_avg() does now.

Introduce SIS_SHORT to control this strategy.

Suggested-by: Tim Chen <[email protected]>
Suggested-by: Vincent Guittot <[email protected]>
Signed-off-by: Chen Yu <[email protected]>
---
include/linux/sched.h | 8 +++++
kernel/sched/core.c | 2 ++
kernel/sched/fair.c | 77 +++++++++++++++++++++++++++++++++++++++++
kernel/sched/features.h | 1 +
4 files changed, 88 insertions(+)

diff --git a/include/linux/sched.h b/include/linux/sched.h
index ffb6eb55cd13..ff74301b1548 100644
--- a/include/linux/sched.h
+++ b/include/linux/sched.h
@@ -557,6 +557,14 @@ struct sched_entity {
u64 prev_sum_exec_runtime;

u64 nr_migrations;
+ /*
+ * The 'snapshot' of sum_exec_runtime when task
+ * voluntarily switches out. This is used to
+ * calculate the average duration below.
+ */
+ u64 prev_sum_runtime_vol;
+ /* average duration of a task */
+ u64 dur_avg;

#ifdef CONFIG_FAIR_GROUP_SCHED
int depth;
diff --git a/kernel/sched/core.c b/kernel/sched/core.c
index 5800b0623ff3..f5281fe7f8f0 100644
--- a/kernel/sched/core.c
+++ b/kernel/sched/core.c
@@ -4330,6 +4330,8 @@ static void __sched_fork(unsigned long clone_flags, struct task_struct *p)
p->se.prev_sum_exec_runtime = 0;
p->se.nr_migrations = 0;
p->se.vruntime = 0;
+ p->se.dur_avg = 0;
+ p->se.prev_sum_runtime_vol = 0;
INIT_LIST_HEAD(&p->se.group_node);

#ifdef CONFIG_FAIR_GROUP_SCHED
diff --git a/kernel/sched/fair.c b/kernel/sched/fair.c
index e4a0b8bd941c..8820d0d14519 100644
--- a/kernel/sched/fair.c
+++ b/kernel/sched/fair.c
@@ -6200,6 +6200,19 @@ static int wake_wide(struct task_struct *p)
return 1;
}

+/*
+ * If a task switches in and then voluntarily relinquishes the
+ * CPU quickly, it is regarded as a short duration task.
+ * sysctl_sched_min_granularity is chosen as the threshold,
+ * as this value is the minimal slice if there are too many
+ * runnable tasks, see __sched_period().
+ */
+static inline int is_short_task(struct task_struct *p)
+{
+ return sched_feat(SIS_SHORT) &&
+ (p->se.dur_avg <= sysctl_sched_min_granularity);
+}
+
/*
* The purpose of wake_affine() is to quickly determine on which CPU we can run
* soonest. For the purpose of speed we only consider the waking and previous
@@ -7679,6 +7692,70 @@ static void put_prev_task_fair(struct rq *rq, struct task_struct *prev)
{
struct sched_entity *se = &prev->se;
struct cfs_rq *cfs_rq;
+ u64 this_dur_avg, last_dur_avg;
+ long delta;
+
+ /*
+ * Calculate the task's average duration.
+ *
+ * Only consider that task voluntarily relinquishes the CPU.
+ * For example, suppose on CPU1, task p1 and p2 runs
+ * alternatively:
+ *
+ * --------------------> time
+ *
+ * | p1 runs 1ms | p2 preempt p1 | p1 runs 0.5ms and sleeps |
+ * ^ ^ ^ ^
+ * |_____________| |__________________________|
+ * |____________________________________|
+ * p1's duration
+ *
+ *
+ * The duration of p1 is 1.5ms rather than 0.5ms or 1ms
+ * in above case. That is to say, the duration period starts
+ * when task p1 switches in, ends when task p1 voluntarily
+ * relinquishes the CPU. This duration descibes the "nature"
+ * of a task: If a task is not preempted, how long it will
+ * run.
+ *
+ * The Exponential Weighted Moving Average (EWMA)
+ * is used to calculate the average duration.
+ * Borrowed from util_est_update():
+ *
+ * ewma(t) = w * this_dur_avg + (1-w) * ewma(t-1)
+ *
+ * When 'w' is 0.125, it becomes update_avg().
+ * This indicates that we care about approximately
+ * the recent 1 / 0.125 = 8 history duration.
+ */
+ if (sched_feat(SIS_SHORT) && !prev->on_rq) {
+ /*
+ * sum_exec_runtime has been updated in update_curr()
+ * because we reach here via dequeue.
+ */
+ this_dur_avg = se->sum_exec_runtime - se->prev_sum_runtime_vol;
+ /*
+ * Record the accumulated runtime when task voluntarily
+ * switches out. End of old duration period, a new period
+ * starts.
+ */
+ se->prev_sum_runtime_vol = se->sum_exec_runtime;
+
+ last_dur_avg = se->dur_avg;
+ delta = this_dur_avg - last_dur_avg;
+ /* consider large change to avoid frequent update */
+ if (abs(delta) >= sysctl_sched_min_granularity) {
+ /*
+ * If it is the first time the task starts to
+ * record dur_avg, discard the initial value 0.
+ * Otherwise, calculate the EWMA.
+ */
+ if (unlikely(!this_dur_avg))
+ se->dur_avg = this_dur_avg;
+ else
+ update_avg(&se->dur_avg, this_dur_avg);
+ }
+ }

for_each_sched_entity(se) {
cfs_rq = cfs_rq_of(se);
diff --git a/kernel/sched/features.h b/kernel/sched/features.h
index ee7f23c76bd3..efdc29c42161 100644
--- a/kernel/sched/features.h
+++ b/kernel/sched/features.h
@@ -62,6 +62,7 @@ SCHED_FEAT(TTWU_QUEUE, true)
*/
SCHED_FEAT(SIS_PROP, false)
SCHED_FEAT(SIS_UTIL, true)
+SCHED_FEAT(SIS_SHORT, true)

/*
* Issue a WARN when we do multiple update_rq_clock() calls
--
2.25.1


2022-10-24 10:26:41

by Abel Wu

[permalink] [raw]
Subject: Re: [RFC PATCH v2 1/2] sched/fair: Introduce short duration task check

LGTM, and please check inline comments.

On 10/23/22 11:32 PM, Chen Yu wrote:
> Introduce short-duration task checks, as there is a
> requirement to leverage this attribute for better task placement.
>
> There are several choices of metrics that could be used to
> indicate if a task is a short-duration task.
>
> At first thought the (p->se.sum_exec_runtime / p->nvcsw)
> could be used to measure the task duration. However, the
> history long past was factored too heavily in such a formula.
> Ideally, the old activity should decay and not affect
> the current status too much.
>
> PELT could decay the runtime time, so maybe something like
> se.util_avg could be used. But after a second thought, PELT
> might not be appropriate to measure the duration:
> 1. Task p1 and task p2 are doing frequent ping-pong scheduling on
> one CPU, both p1 and p2 have a short duration, but the util_avg
> can be up to 50%.
> 2. Suppose a task lasting less than 4ms is regarded as a short task.
> If task p3 runs for 6ms and sleeps for 32ms, it should not be a
> short-duration task. However, PELT would decay p3's accumulated
> running time from 6ms to 3ms, because 32ms is the half-life in PELT.
> As a result, p3 would be incorrectly treated as a short task.
>
> It was found that there was once a similar feature to track the
> duration of a task, which is in Commit ad4b78bbcbab ("sched: Add
> new wakeup preemption mode: WAKEUP_RUNNING"). Unfortunately, it
> was reverted because it was an experiment. So pick the patch up
> again, by recording the average duration when a task voluntarily
> switches out. The calculation of average duration is borrowed
> from the idea of Exponential Weighted Moving Average (EWMA) in
> util_est_update(). The effect is that the average task duration
> is calculated by:
> new_avg_duration = old_avg_duration * 0.875 + lastest_duration * 0.125;
> which is what update_avg() does now.
>
> Introduce SIS_SHORT to control this strategy.
>
> Suggested-by: Tim Chen <[email protected]>
> Suggested-by: Vincent Guittot <[email protected]>
> Signed-off-by: Chen Yu <[email protected]>
> ---
> include/linux/sched.h | 8 +++++
> kernel/sched/core.c | 2 ++
> kernel/sched/fair.c | 77 +++++++++++++++++++++++++++++++++++++++++
> kernel/sched/features.h | 1 +
> 4 files changed, 88 insertions(+)
>
> diff --git a/include/linux/sched.h b/include/linux/sched.h
> index ffb6eb55cd13..ff74301b1548 100644
> --- a/include/linux/sched.h
> +++ b/include/linux/sched.h
> @@ -557,6 +557,14 @@ struct sched_entity {
> u64 prev_sum_exec_runtime;
>
> u64 nr_migrations;
> + /*
> + * The 'snapshot' of sum_exec_runtime when task
> + * voluntarily switches out. This is used to
> + * calculate the average duration below.
> + */
> + u64 prev_sum_runtime_vol;
> + /* average duration of a task */
> + u64 dur_avg;
>
> #ifdef CONFIG_FAIR_GROUP_SCHED
> int depth;
> diff --git a/kernel/sched/core.c b/kernel/sched/core.c
> index 5800b0623ff3..f5281fe7f8f0 100644
> --- a/kernel/sched/core.c
> +++ b/kernel/sched/core.c
> @@ -4330,6 +4330,8 @@ static void __sched_fork(unsigned long clone_flags, struct task_struct *p)
> p->se.prev_sum_exec_runtime = 0;
> p->se.nr_migrations = 0;
> p->se.vruntime = 0;
> + p->se.dur_avg = 0;
> + p->se.prev_sum_runtime_vol = 0;
> INIT_LIST_HEAD(&p->se.group_node);
>
> #ifdef CONFIG_FAIR_GROUP_SCHED
> diff --git a/kernel/sched/fair.c b/kernel/sched/fair.c
> index e4a0b8bd941c..8820d0d14519 100644
> --- a/kernel/sched/fair.c
> +++ b/kernel/sched/fair.c
> @@ -6200,6 +6200,19 @@ static int wake_wide(struct task_struct *p)
> return 1;
> }
>
> +/*
> + * If a task switches in and then voluntarily relinquishes the
> + * CPU quickly, it is regarded as a short duration task.
> + * sysctl_sched_min_granularity is chosen as the threshold,
> + * as this value is the minimal slice if there are too many
> + * runnable tasks, see __sched_period().
> + */
> +static inline int is_short_task(struct task_struct *p)
> +{
> + return sched_feat(SIS_SHORT) &&
> + (p->se.dur_avg <= sysctl_sched_min_granularity);

The min_granularity is default to 750us, and can be tuned higher on
machines running batch workloads. So I'm not sure it is appropriate
to define 'short' by min_granularity.

> +}
> +
> /*
> * The purpose of wake_affine() is to quickly determine on which CPU we can run
> * soonest. For the purpose of speed we only consider the waking and previous
> @@ -7679,6 +7692,70 @@ static void put_prev_task_fair(struct rq *rq, struct task_struct *prev)
> {
> struct sched_entity *se = &prev->se;
> struct cfs_rq *cfs_rq;
> + u64 this_dur_avg, last_dur_avg;
> + long delta;
> +
> + /*
> + * Calculate the task's average duration.
> + *
> + * Only consider that task voluntarily relinquishes the CPU.
> + * For example, suppose on CPU1, task p1 and p2 runs
> + * alternatively:
> + *
> + * --------------------> time
> + *
> + * | p1 runs 1ms | p2 preempt p1 | p1 runs 0.5ms and sleeps |
> + * ^ ^ ^ ^
> + * |_____________| |__________________________|
> + * |____________________________________|
> + * p1's duration
> + *
> + *
> + * The duration of p1 is 1.5ms rather than 0.5ms or 1ms
> + * in above case. That is to say, the duration period starts
> + * when task p1 switches in, ends when task p1 voluntarily
> + * relinquishes the CPU. This duration descibes the "nature"
> + * of a task: If a task is not preempted, how long it will
> + * run.
> + *
> + * The Exponential Weighted Moving Average (EWMA)
> + * is used to calculate the average duration.
> + * Borrowed from util_est_update():
> + *
> + * ewma(t) = w * this_dur_avg + (1-w) * ewma(t-1)
> + *
> + * When 'w' is 0.125, it becomes update_avg().
> + * This indicates that we care about approximately
> + * the recent 1 / 0.125 = 8 history duration.
> + */
> + if (sched_feat(SIS_SHORT) && !prev->on_rq) {
> + /*
> + * sum_exec_runtime has been updated in update_curr()
> + * because we reach here via dequeue.
> + */
> + this_dur_avg = se->sum_exec_runtime - se->prev_sum_runtime_vol;
> + /*
> + * Record the accumulated runtime when task voluntarily
> + * switches out. End of old duration period, a new period
> + * starts.
> + */
> + se->prev_sum_runtime_vol = se->sum_exec_runtime;
> +
> + last_dur_avg = se->dur_avg;
> + delta = this_dur_avg - last_dur_avg;
> + /* consider large change to avoid frequent update */
> + if (abs(delta) >= sysctl_sched_min_granularity) {
> + /*
> + * If it is the first time the task starts to
> + * record dur_avg, discard the initial value 0.
> + * Otherwise, calculate the EWMA.
> + */
> + if (unlikely(!this_dur_avg))
> + se->dur_avg = this_dur_avg;

Would it better initialize to 'short' (min_granularity in this case)?
So we can get rid of this check.

> + else
> + update_avg(&se->dur_avg, this_dur_avg);
> + }
> + }
>
> for_each_sched_entity(se) {
> cfs_rq = cfs_rq_of(se);
> diff --git a/kernel/sched/features.h b/kernel/sched/features.h
> index ee7f23c76bd3..efdc29c42161 100644
> --- a/kernel/sched/features.h
> +++ b/kernel/sched/features.h
> @@ -62,6 +62,7 @@ SCHED_FEAT(TTWU_QUEUE, true)
> */
> SCHED_FEAT(SIS_PROP, false)
> SCHED_FEAT(SIS_UTIL, true)
> +SCHED_FEAT(SIS_SHORT, true)
>
> /*
> * Issue a WARN when we do multiple update_rq_clock() calls

2022-10-25 05:28:09

by Chen Yu

[permalink] [raw]
Subject: Re: [RFC PATCH v2 1/2] sched/fair: Introduce short duration task check

Hi Abel,
On 2022-10-24 at 18:10:22 +0800, Abel Wu wrote:
> LGTM, and please check inline comments.
>
> On 10/23/22 11:32 PM, Chen Yu wrote:
> > Introduce short-duration task checks, as there is a
> > requirement to leverage this attribute for better task placement.
> >
> > There are several choices of metrics that could be used to
> > indicate if a task is a short-duration task.
> >
> > At first thought the (p->se.sum_exec_runtime / p->nvcsw)
> > could be used to measure the task duration. However, the
> > history long past was factored too heavily in such a formula.
> > Ideally, the old activity should decay and not affect
> > the current status too much.
> >
> > PELT could decay the runtime time, so maybe something like
> > se.util_avg could be used. But after a second thought, PELT
> > might not be appropriate to measure the duration:
> > 1. Task p1 and task p2 are doing frequent ping-pong scheduling on
> > one CPU, both p1 and p2 have a short duration, but the util_avg
> > can be up to 50%.
> > 2. Suppose a task lasting less than 4ms is regarded as a short task.
> > If task p3 runs for 6ms and sleeps for 32ms, it should not be a
> > short-duration task. However, PELT would decay p3's accumulated
> > running time from 6ms to 3ms, because 32ms is the half-life in PELT.
> > As a result, p3 would be incorrectly treated as a short task.
> >
> > It was found that there was once a similar feature to track the
> > duration of a task, which is in Commit ad4b78bbcbab ("sched: Add
> > new wakeup preemption mode: WAKEUP_RUNNING"). Unfortunately, it
> > was reverted because it was an experiment. So pick the patch up
> > again, by recording the average duration when a task voluntarily
> > switches out. The calculation of average duration is borrowed
> > from the idea of Exponential Weighted Moving Average (EWMA) in
> > util_est_update(). The effect is that the average task duration
> > is calculated by:
> > new_avg_duration = old_avg_duration * 0.875 + lastest_duration * 0.125;
> > which is what update_avg() does now.
> >
> > Introduce SIS_SHORT to control this strategy.
> >
> > Suggested-by: Tim Chen <[email protected]>
> > Suggested-by: Vincent Guittot <[email protected]>
> > Signed-off-by: Chen Yu <[email protected]>
> > ---
> > include/linux/sched.h | 8 +++++
> > kernel/sched/core.c | 2 ++
> > kernel/sched/fair.c | 77 +++++++++++++++++++++++++++++++++++++++++
> > kernel/sched/features.h | 1 +
> > 4 files changed, 88 insertions(+)
> >
> > diff --git a/include/linux/sched.h b/include/linux/sched.h
> > index ffb6eb55cd13..ff74301b1548 100644
> > --- a/include/linux/sched.h
> > +++ b/include/linux/sched.h
> > @@ -557,6 +557,14 @@ struct sched_entity {
> > u64 prev_sum_exec_runtime;
> > u64 nr_migrations;
> > + /*
> > + * The 'snapshot' of sum_exec_runtime when task
> > + * voluntarily switches out. This is used to
> > + * calculate the average duration below.
> > + */
> > + u64 prev_sum_runtime_vol;
> > + /* average duration of a task */
> > + u64 dur_avg;
> > #ifdef CONFIG_FAIR_GROUP_SCHED
> > int depth;
> > diff --git a/kernel/sched/core.c b/kernel/sched/core.c
> > index 5800b0623ff3..f5281fe7f8f0 100644
> > --- a/kernel/sched/core.c
> > +++ b/kernel/sched/core.c
> > @@ -4330,6 +4330,8 @@ static void __sched_fork(unsigned long clone_flags, struct task_struct *p)
> > p->se.prev_sum_exec_runtime = 0;
> > p->se.nr_migrations = 0;
> > p->se.vruntime = 0;
> > + p->se.dur_avg = 0;
> > + p->se.prev_sum_runtime_vol = 0;
> > INIT_LIST_HEAD(&p->se.group_node);
> > #ifdef CONFIG_FAIR_GROUP_SCHED
> > diff --git a/kernel/sched/fair.c b/kernel/sched/fair.c
> > index e4a0b8bd941c..8820d0d14519 100644
> > --- a/kernel/sched/fair.c
> > +++ b/kernel/sched/fair.c
> > @@ -6200,6 +6200,19 @@ static int wake_wide(struct task_struct *p)
> > return 1;
> > }
> > +/*
> > + * If a task switches in and then voluntarily relinquishes the
> > + * CPU quickly, it is regarded as a short duration task.
> > + * sysctl_sched_min_granularity is chosen as the threshold,
> > + * as this value is the minimal slice if there are too many
> > + * runnable tasks, see __sched_period().
> > + */
> > +static inline int is_short_task(struct task_struct *p)
> > +{
> > + return sched_feat(SIS_SHORT) &&
> > + (p->se.dur_avg <= sysctl_sched_min_granularity);
>
> The min_granularity is default to 750us, and can be tuned higher on
> machines running batch workloads. So I'm not sure it is appropriate
> to define 'short' by min_granularity.
>
Yes, it seems that 'short' is a subjective term, different user/system
might have different defination of 'short' task. For a system that set
a high sysctl_sched_min_granularity, the admin might expect that most CFS
tasks should last longer. That is to say, if a task's duration is 1ms when
sysctl_sched_min_granularity is 750us, it is not a short task. But if we
enlarge the sysctl_sched_min_granularity to 2ms, this task becomes a short
one, when compared to other CFS tasks in the system. You are right binding
the 'short duration' with sysctl_sched_min_granularity might look subjective,
but I can not find other existing metrics(also configurable by userspace)
in the kernel to describe this.
> > +}
> > +
> > /*
> > * The purpose of wake_affine() is to quickly determine on which CPU we can run
> > * soonest. For the purpose of speed we only consider the waking and previous
> > @@ -7679,6 +7692,70 @@ static void put_prev_task_fair(struct rq *rq, struct task_struct *prev)
> > {
> > struct sched_entity *se = &prev->se;
> > struct cfs_rq *cfs_rq;
> > + u64 this_dur_avg, last_dur_avg;
> > + long delta;
> > +
> > + /*
> > + * Calculate the task's average duration.
> > + *
> > + * Only consider that task voluntarily relinquishes the CPU.
> > + * For example, suppose on CPU1, task p1 and p2 runs
> > + * alternatively:
> > + *
> > + * --------------------> time
> > + *
> > + * | p1 runs 1ms | p2 preempt p1 | p1 runs 0.5ms and sleeps |
> > + * ^ ^ ^ ^
> > + * |_____________| |__________________________|
> > + * |____________________________________|
> > + * p1's duration
> > + *
> > + *
> > + * The duration of p1 is 1.5ms rather than 0.5ms or 1ms
> > + * in above case. That is to say, the duration period starts
> > + * when task p1 switches in, ends when task p1 voluntarily
> > + * relinquishes the CPU. This duration descibes the "nature"
> > + * of a task: If a task is not preempted, how long it will
> > + * run.
> > + *
> > + * The Exponential Weighted Moving Average (EWMA)
> > + * is used to calculate the average duration.
> > + * Borrowed from util_est_update():
> > + *
> > + * ewma(t) = w * this_dur_avg + (1-w) * ewma(t-1)
> > + *
> > + * When 'w' is 0.125, it becomes update_avg().
> > + * This indicates that we care about approximately
> > + * the recent 1 / 0.125 = 8 history duration.
> > + */
> > + if (sched_feat(SIS_SHORT) && !prev->on_rq) {
> > + /*
> > + * sum_exec_runtime has been updated in update_curr()
> > + * because we reach here via dequeue.
> > + */
> > + this_dur_avg = se->sum_exec_runtime - se->prev_sum_runtime_vol;
> > + /*
> > + * Record the accumulated runtime when task voluntarily
> > + * switches out. End of old duration period, a new period
> > + * starts.
> > + */
> > + se->prev_sum_runtime_vol = se->sum_exec_runtime;
> > +
> > + last_dur_avg = se->dur_avg;
> > + delta = this_dur_avg - last_dur_avg;
> > + /* consider large change to avoid frequent update */
> > + if (abs(delta) >= sysctl_sched_min_granularity) {
> > + /*
> > + * If it is the first time the task starts to
> > + * record dur_avg, discard the initial value 0.
> > + * Otherwise, calculate the EWMA.
> > + */
> > + if (unlikely(!this_dur_avg))
> > + se->dur_avg = this_dur_avg;
>
> Would it better initialize to 'short' (min_granularity in this case)?
> So we can get rid of this check.
>
Good suggestion, the task is initilized as 'non-short', and
is_short_task() needs to be modified from "<=" to "<".

thanks,
Chenyu
> > + else
> > + update_avg(&se->dur_avg, this_dur_avg);
> > + }
> > + }
> > for_each_sched_entity(se) {
> > cfs_rq = cfs_rq_of(se);
> > diff --git a/kernel/sched/features.h b/kernel/sched/features.h
> > index ee7f23c76bd3..efdc29c42161 100644
> > --- a/kernel/sched/features.h
> > +++ b/kernel/sched/features.h
> > @@ -62,6 +62,7 @@ SCHED_FEAT(TTWU_QUEUE, true)
> > */
> > SCHED_FEAT(SIS_PROP, false)
> > SCHED_FEAT(SIS_UTIL, true)
> > +SCHED_FEAT(SIS_SHORT, true)
> > /*
> > * Issue a WARN when we do multiple update_rq_clock() calls

2022-11-03 13:05:37

by Peter Zijlstra

[permalink] [raw]
Subject: Re: [RFC PATCH v2 1/2] sched/fair: Introduce short duration task check

On Sun, Oct 23, 2022 at 11:32:31PM +0800, Chen Yu wrote:

> + if (sched_feat(SIS_SHORT) && !prev->on_rq) {
> + /*
> + * sum_exec_runtime has been updated in update_curr()
> + * because we reach here via dequeue.
> + */
> + this_dur_avg = se->sum_exec_runtime - se->prev_sum_runtime_vol;
> + /*
> + * Record the accumulated runtime when task voluntarily
> + * switches out. End of old duration period, a new period
> + * starts.
> + */
> + se->prev_sum_runtime_vol = se->sum_exec_runtime;
> +
> + last_dur_avg = se->dur_avg;
> + delta = this_dur_avg - last_dur_avg;
> + /* consider large change to avoid frequent update */
> + if (abs(delta) >= sysctl_sched_min_granularity) {
> + /*
> + * If it is the first time the task starts to
> + * record dur_avg, discard the initial value 0.
> + * Otherwise, calculate the EWMA.
> + */
> + if (unlikely(!this_dur_avg))
> + se->dur_avg = this_dur_avg;
> + else
> + update_avg(&se->dur_avg, this_dur_avg);
> + }
> + }

This seems excessively convoluted; what's wrong with something like:

if (sched_feat(SIS_SHORT) && !prev->on_rq) {
u64 this_dur = se->sum_exec_runtime - se->prev_sum_exec_runtime_vol;
se->prev_sum_exec_runtime_vol = se->sum_exec_runtime;

update_avg(&se->dur_avg, this_dur);
}

All that other stuff just makes it unreadable and probably slower.

2022-11-04 04:40:36

by Chen Yu

[permalink] [raw]
Subject: Re: [RFC PATCH v2 1/2] sched/fair: Introduce short duration task check

Hi Peter,
thanks for your review,
On 2022-11-03 at 13:44:12 +0100, Peter Zijlstra wrote:
> On Sun, Oct 23, 2022 at 11:32:31PM +0800, Chen Yu wrote:
>
> > + if (sched_feat(SIS_SHORT) && !prev->on_rq) {
> > + /*
> > + * sum_exec_runtime has been updated in update_curr()
> > + * because we reach here via dequeue.
> > + */
> > + this_dur_avg = se->sum_exec_runtime - se->prev_sum_runtime_vol;
> > + /*
> > + * Record the accumulated runtime when task voluntarily
> > + * switches out. End of old duration period, a new period
> > + * starts.
> > + */
> > + se->prev_sum_runtime_vol = se->sum_exec_runtime;
> > +
> > + last_dur_avg = se->dur_avg;
> > + delta = this_dur_avg - last_dur_avg;
> > + /* consider large change to avoid frequent update */
> > + if (abs(delta) >= sysctl_sched_min_granularity) {
> > + /*
> > + * If it is the first time the task starts to
> > + * record dur_avg, discard the initial value 0.
> > + * Otherwise, calculate the EWMA.
> > + */
> > + if (unlikely(!this_dur_avg))
> > + se->dur_avg = this_dur_avg;
> > + else
> > + update_avg(&se->dur_avg, this_dur_avg);
> > + }
> > + }
>
> This seems excessively convoluted; what's wrong with something like:
>
> if (sched_feat(SIS_SHORT) && !prev->on_rq) {
> u64 this_dur = se->sum_exec_runtime - se->prev_sum_exec_runtime_vol;
> se->prev_sum_exec_runtime_vol = se->sum_exec_runtime;
>
> update_avg(&se->dur_avg, this_dur);
> }
>
> All that other stuff just makes it unreadable and probably slower.
OK, I'll try your suggestion in next version.

thanks,