Return-Path: Received: (majordomo@vger.kernel.org) by vger.kernel.org via listexpand id ; Sun, 7 Oct 2001 14:34:51 -0400 Received: (majordomo@vger.kernel.org) by vger.kernel.org id ; Sun, 7 Oct 2001 14:34:42 -0400 Received: from [208.129.208.52] ([208.129.208.52]:63501 "EHLO xmailserver.org") by vger.kernel.org with ESMTP id ; Sun, 7 Oct 2001 14:34:25 -0400 Date: Sun, 7 Oct 2001 11:39:52 -0700 (PDT) From: Davide Libenzi X-X-Sender: davide@blue1.dev.mcafeelabs.com To: Mika Liljeberg cc: Alan Cox , Benjamin LaHaise , Linus Torvalds , Subject: Re: Context switch times In-Reply-To: <3BC02709.A8E6F999@welho.com> Message-ID: MIME-Version: 1.0 Content-Type: TEXT/PLAIN; charset=US-ASCII Sender: linux-kernel-owner@vger.kernel.org X-Mailing-List: linux-kernel@vger.kernel.org On Sun, 7 Oct 2001, Mika Liljeberg wrote: > Alan Cox wrote: > > This isnt idle speculation - I've done some minimal playing with this but > > my initial re-implementation didnt handle SMP at all and I am still not 100% > > sure how to resolve SMP or how SMP will improve out of the current cunning > > plan. > > Here's some idle speculation on SMP to top it off. :) I tend to think > that the load balancing between CPUs should be a completely separate > algorithim and should not necessarily be run at every schedule(). The > idea is to compeletely decouple the problem of scheduling a single CPU > between tasks and the problem of load balancing between the CPUs, making > each problem simpler to solve. > > Consider the following basic rules: > > A) When a new task comes along, pick the "least loaded" CPU and lock the > new task onto that. > B) Whenever the load imbalance between least loaded CPU and most loaded > CPU becomes too great, move one or more tasks from most loaded CPU to > the least loaded CPU. > > The rules themselves should be self-explanatory: A provides initial load > balancing, while B tries to keep the balance (with a sensible hysteresis > to avoid thrashing). However, there are a few minor details to solve: > > 1) How to determine the load of a CPU? If we can quantify this clearly, > we can easily set a hysteresis level to trigger load balancing between > two CPUs. > 2) When and how often to check for load imbalance? > 3) How to select the task(s) that should be moved between two CPUs to > correct an imbalance? > > For problems 1 and 2 I propose the following solution: Insert the the > load balancing routine itself as a (fake) task on each CPU and run it > when the CPU gets around to it. The load balancer should behave almost > like a CPU-bound task, scheduled on the lowest priority level with other > runnable tasks. The last bit is important: the load balancer should not > be allowed to starve but should be invoked approximately once every > "full rotation" of the scheduler. > > With the above it is easy to estimate the load of a CPU. We can simply > use the elapsed time between two invokations of the load balancer task. > When the load balancer task of a particular CPU gets run, it chalks up > the elapsed time on a score board somewhere, and checks whether there is > a significant imbalance between itself and some other CPU. If there is, > it commences to move some tasks between itself and the other CPU (note > rule B, though, it should be enough to mess with just two CPU queues at > a time to minimize balancing and locking overhead). > > Problem 3 is tricky. Basically, there should be a cost/benefit function > F(tasks to move) that should be minimized. Ideally F(task_i), the > cost/benefit of moving a single task, would be calculated as a byproduct > of the CPU scheduler algorithm. > > F(task_i) might be function of elapsed time since task_i was last > scheduled and the average time slice used by task_i, to account for the > probable cache hit. This would leave it up to the load balancer to move > as many lowest cost tasks to a new CPU as is needed to correct the > imbalance (average time slices used by each task would be needed in > order to make this decision). > > Naturally, some additional rules might be necessary to make a task > eligible for moving, e.g., never move the only/last CPU bound task to > another CPU. In addition, it might actually make sense to move at most > one task at each invocation of the load balancer, to further reduce the > probability of thrashing. The load would still converge fairly quickly > towards a balanced state. It would also scale fairly well with the > number of CPUs. > > How does that sound? To measure the load of a cpu "nr_running" ( per cpu ) is probably the best choice. Anyway there's some work already done : http://lse.sourceforge.net/scheduling/LB/poolMQ.html - Davide - To unsubscribe from this list: send the line "unsubscribe linux-kernel" in the body of a message to majordomo@vger.kernel.org More majordomo info at http://vger.kernel.org/majordomo-info.html Please read the FAQ at http://www.tux.org/lkml/