I did lots of style corrections and created the patch (0001) but when I
checked it the report said there were errors so I made the changes and
created a new patch (0002) but it didn't have all my original changes in
it. This is why have attached two similar patches.
I know it is best if the patches are inside the body of the email
instead of attached but I do not have an email client set up that can
send the patches with the correct formatting. I'll work on it ready for
next time.
Cheers,
Stewart
On Sun, Feb 21, 2010 at 11:56:43AM +0000, Stewart Robertson wrote:
> I did lots of style corrections and created the patch (0001) but
> when I checked it the report said there were errors so I made the
> changes and created a new patch (0002) but it didn't have all my
> original changes in it. This is why have attached two similar
> patches.
>
> I know it is best if the patches are inside the body of the email
> instead of attached but I do not have an email client set up that
> can send the patches with the correct formatting. I'll work on it
> ready for next time.
Thanks, I've queued up both of these, with a few changes.
greg k-h